Datuk Liang Teck Meng minta MENTERI TENAGA, TEKNOLOGI HIJAU DAN AIR menyatakan mengenai isu tenaga solar sebagai sumber tenaga alternatif dan insentif yang boleh diberikan bagi menyahut langkah ini.
Jawapan
Tuan Yang Dipertua,

Untuk Makluman Ahli Yang Berhormat,

1.       Kerajaan sememangnya telah mengenalpasti tenaga solar sebagai salah satu sumber tenaga alternatif yang boleh menyumbang kepada kelestarian bekalan elektrik Negara.  Bagi mengembangkan penggunaan tenaga solar ini, Kerajaan telah mewujudkan mekanisme tariff galakan atau Feed-In-Tariff (FiT) di bawah Akta Tenaga Boleh Baharu 2011 (Akta 725).  Pelaksanaan FiT ini dapat menggalakkan orang ramai dan pihak swasta menjana Tenaga Boleh Baharu dan mendapat pulangan daripada pelaksanaannya.  Setakat 28 Februari 2015, sebanyak 185 MW adalah dari sumber solar PV bagi pepasangan komersil dan individu daripada jumlah keseluruhan 265MW Tenaga Boleh Baharu yang dihasilkan.

2.        Mekanisme FiT dilaksanakan bagi meningkatkan daya maju projek-projek Tenaga Boleh Baharu termasuk solar PV. Dengan adanya mekanisme ini, pihak institusi kewangan lebih selesa memberikan pinjaman kepada pemaju yang terbabit kerana terdapat jaminan dari segi pendapatan melalui Renewable Energy Power Purchase Agreement (REPPA) yang ditandatangani di antara pemaju dan pihak utiliti. Melalui pemerhatian, pemaju-pemaju Tenaga Boleh Baharu di bawah Mekanisme FiT mempunyai peluang yang tinggi bagi mendapatkan pembiayaan daripada institusi kewangan.

Untuk makluman Ahli-ahli Yang Berhormat,

3.       Kerajaan juga telah memperkenalkan Green Technology Financing Scheme (GTFS) semasa pembentangan Bajet 2010 dengan jumlah pembiayaan sebanyak RM1.5 bilion dengan peruntukan tambahan sebanyak RM 2 bilion pada tahun 2013 yang merupakan skim pembiayaan khas untuk menyokong pembangunan Teknologi Hijau di Malaysia. GTFS adalah pinjaman mudah yang disokong oleh Kerajaan dimana pemaju-pemaju termasuk yang terlibat dalam Tenaga Boleh Baharu komersil adalah layak bagi mendapatkan pembiayaan ini. Di bawah skim ini, pemaju akan dapat menikmati:
a.   Subsidi faedah sebanyak 2% daripada jumlah kadar faedah yang dikenakan; dan
b.   Jaminan Kerajaan sebanyak 60% daripada jumlah pinjaman yang diluluskan.

4.       Kerajaan juga bercadang untuk melaksanakan program solar berskala utiliti iaitu pembinaan solar farm, dengan izin, dengan kapasiti 30 MW dan lebih. Program ini akan dilaksanakan oleh pihak SEDA dengan kerjasama Suruhanjaya Tenaga melalui bidaan terbuka bagi Semenanjung dahulu.

5.       Bagi memperluaskan kegunaan tenaga solar di Bangunan-bangunan, Kerajaan telah memberikan sejumlah peruntukan sebanyak RM 8.0 juta di bawah Bajet 2014 bagi pemasangan Sistem Solar Fotovolta (PV) Tersambung Grid di bangunan-bangunan Kerajaan terpilih. Pepasangan Sistem Solar PV bertujuan menggalakkan penggunaan tenaga hijau untuk mengurangkan pembebasan gas karbon dioksida, disamping mengurangkan bil elektrik serta memberi pendedahan mengenai penggunaan Tenaga Boleh Baharu. Di bawah program tersebut, sebanyak 25 Kementerian di Putrajaya dipasang dengan sistem solar PV dengan kapasiti di antara 12 hingga 48kW setiap satu. Pada masa ini, status projek tersebut adalah 93% siap dan dijangka akan siap sepenuhnya pada April 2015.


Untuk pertanyaan media, sila hubungi:
Kementerian Tenaga, Teknologi Hijau dan Air

Che Hazlina Yusof
E-mel: hazlina@kettha.gov.my
Mobile: 012 – 2695759 

GreenTech Malaysia
Syuhida Silmi
E-mel: syuhida@greentechmalaysia.my
Mobile: 011-11841165


Untuk sebarang pertanyaan media, sila hubungi: 
Muhamad Faiz Muhamad Pauzi 
Yayasan Hijau Malaysia T: 019-2046070 | E: faiz@yahijau.com 
mChe Hazlina Yusof Kementerian Tenaga, 
Teknologi Hijau dan Air (KeTTHA) T:012-2695759 | E: hazlina@kettha.gov.my

Projek Pemasangan Panel Solar

Projek Pemasangan Panel Solar Terapung Kini Di Peringkat Akhir - Mohamad
SEREMBAN, 5 Ogos (Bernama) -- Projek percubaan pemasangan panel solar terapung di Empangan Sungai Terip di sini, yang dijangka menghasilkan tenaga solar sebanyak tujuh hingga 10 megawatt (MW) kini berada di peringkat akhir pelaksanaan.
Menteri Besar Negeri Sembilan Datuk Seri Mohamad Hasan berkata kerajaan negeri kini sedang memohon kuota tambahan daripada Pembangunan Tenaga Lestari Malaysia (SEDA Malaysia) memandangkan kuota tenaga yang diperuntukkan telah digunakan sepenuhnya.
"Kita di peringkat akhir untuk melihat cara mana kerajaan negeri dan syarikat tersebut untuk mengadakan satu kerjasama dan kita akan adakan percubaan di mana lebih kurang 1/5 daripada permukaan Empangan Sungai Terip akan kita adakan solar panel terapung pertama dalam negara kita.
"Berkenaan kuota tenaga pula, ia terpulang pada SEDA Malaysia nak beri berapa dan kita sedang minta kuota dari negeri lain yang tidak digunakan," katanya kepada pemberita pada majlis Jamuan Hari Raya anjuran Setiausaha Kerajaan Negeri Datuk Mat Ali Hassan, di sini, Rabu.
Setakat ini, Negeri Sembilan mempunyai empat tapak loji tenaga boleh baharu yang beroperasi di Pajam, Nilai; Kuala Sawah, Seremban; Bukit Palong, Port Dickson; dan Gemas yang boleh menjana kuasa elektrik sebanyak 32MW.
Kesemua loji tenaga boleh baharu tersebut berkeupayaan menyalurkan kuasa elektrik kepada lebih 20,000 buah rumah di negeri ini.
"Banyak lagi tempat yang sedang kita lihat yang boleh dijadikan tempat yang berdaya maju untuk mengeluarkan tenaga solar," katanya.
Sementara itu dalam perkembangan lain, Mohamad berkata kerajaan negeri masih menunggu maklum balas daripada Kementerian Perumahan dan Kerajaan Tempatan berhubung pelaksanaan penalti di bawah Akta Pengurusan Sisa Pepejal dan Pembersihan Awam 2007.
"Bukan kita tidak mahu jayakan dasar ini, tetapi apa yang kita beri ulasan ialah berkenaan pelaksanaan penalti sehingga RM1,000 kepada isi rumah yang tidak mengasingkan sampah mereka akan membebankan rakyat negeri ini, dan itu yang cuba kita elakkan," katanya.
Beliau berharap pihak konsesi yang telah dilantik SWM Environment Sdn Bhd (SWM) dapat bekerjasama dengan pihak berkuasa tempatan untuk melaksanakan kempen kesedaran pengasingan sisa pepejal kepada penduduk negeri ini sebelum melaksanakan penalti tersebut.
Pengasingan sisa pepejal yang dilaksanakan bermula 1 September ini akan dikuatkuasakan sepenuh-nya di Wilayah Persekutuan Kuala Lumpur, Putrajaya, Pahang, Johor, Melaka, Negeri Sembilan, Perlis dan Kedah.
Pautan: http://www.bernama.com/bernama/v8/bm/bu/newsbusiness.php?id=1158697


Malaysia Sedia Jana Lebih 2,000 Megawatt Tenaga Boleh Diperbaharu Menjelang 2020
KUALA LUMPUR, 6 Okt (Bernama) -- Malaysia bersedia untuk menjana lebih 2,000 megawatt (MW) tenaga daripada sumber tenaga boleh diperbaharui (RE) pada tahun 2020 berikutan dua mekanisme baharu yang diluluskan oleh kerajaan, iaitu pemeteran bersih dan solar skala utiliti (USS).

Ketua Pegawai Operasi Pihak Berkuasa Pembangunan Tenaga Lestari (SEDA) Datuk Ali Askar Sher Mohamad berkata perkembangan dalam RE menggalakkan sejak pengenalan galakan tarif (FiT) pada 2011, dengan 400 MW atau 40 peratus telah disambungkan kepada grid tenaga solar, daripada sasaran 1,000 MW pada 2015.

"Bersama sokongan kerajaan, kami menjangkakan melebihi sasaran 2,000 MW dengan kedua-dua mekanisme ini dan FiT yang sedia ada untuk jaminan tenaga.

"Kita tidak boleh bergantung kepada tenaga arang batu yang kita import sepenuhnya terutamanya dari Indonesia. Tambahan pula, kos solar fotovolta (PV) adalah tetap, jadi kita perlu untuk membawa RE tidak lama lagi, kerana diramalkan subsidi kerajaan akan dikaji semula dan dikurangkan," katanya kepada Bernama.

Beliau berkata demikian ketika ditemui di luar sesi Forum Perniagaan ASEAN 2015 mengenai "Tenaga boleh diperbaharui: Perkongsian Teknologi dan Amalan Terbaik" di sini Selasa.

Beliau berkata, tahap minat untuk melabur dalam RE, terutamanya dalam PV solar, amat menggalakkan daripada institusi kewangan disebabkan oleh hasil yang telah terbukti.

"Bagaimanapun, sumber-sumber RE daripada sektor biojisim dan hidro kecil masih kurang kerana tidak banyak cerita kejayaan untuk merangsang lebih banyak pelaburan.

"Kami sedang berusaha untuk meningkatkan teknologi untuk sumber RE lain dan akan melibatkan diri dengan pelbagai peserta industri seperti kilang minyak, pemilik ladang dan dana asing yang berminat, untuk melihat bagaimana pelaburan boleh dibuat untuk menjana lebih banyak sumber RE di Malaysia," kata Ali.

Sementara itu, Ketua Pegawai Eksekutif SEDA Catherine Ridu berkata permeteran bersih yang membolehkan pengguna memasang panel PV solar di bumbung premis, akan memberi manfaat kepada mereka, kerana mereka boleh mengawal bil elektrik mereka dalam menjana tenaga elektrik pada waktu siang.

"Ini adalah satu mekanisme yang baik yang mungkin bermula tahun depan dan sebaik sahaja kami berbincang dengan pihak berkepentingan berkenaan, iaitu Suruhanjaya Tenaga serta Kementerian Tenaga, Teknologi Hijau dan Air (KeTTHA), mengenai rangka kerja dan dasar yang akan dibuat," katanya.

Beliau berkata tenaga solar kini telah menjadi pendekatan yang paling popular dalam penggunaan RE kerana ia adalah perubahan paling mudah, berbanding dengan biojisim, biogas dan hidro.

"Kami ingin melihat FiT tersedia lebih lagi bagi pemain kecil dan individu. Bagi pemain yang lebih besar yang ingin menubuhkan lebih banyak daripada 1 MW tenaga solar, kami mencadangkan mereka kepada USS," katanya.

Beliau berkata SEDA akan terus meninjau kemungkinan lain daripada sumber RE, termasuk daripada sisa pepejal, dengan banyak tapak pelupusan sampah di negara ini tidak dimanfaatkan dan dengan potensi menjana kekayaan menggunakan teknologi yang tepat.

Dalam proses itu katanya, ia akan mengurangkan pengeluaran karbon dioksida dan mewujudkan persekitaran yang lebih bersih untuk generasi akan datang.

-- BERNAMA

SOLAR MALAYSIA

Malaysia cukup solar
BARU-BARU ini, Panasonic Energy Malaysia Sdn Bhd (Panasonic) iaitu syarikat penghasilan solar Panasonic Corporation yang ditubuhkan di Malaysia pada Disember 2011 mengadakan majlis pecah tanah dan pertukaran Perjanjian Sewaan Tanah dengan kerajaan negeri Kedah.
Ia menyaksikan Panasonic menghasilkan kemudahan prasarana penghasilan solar baru yang akan dibina secepat mungkin selain berhasrat dapat memulakan operasinya menjelang Disember 2012.
KEDAH, MAC 7, 2012 (Harian Metro) -- Prasarana itu yang dinamakan Pusat Solar Bersepadu, pertama dibina di Asia (luar Jepun) bakal mengeluarkan produk menyeluruh berkaitan solar yang belum pernah diteroka mana-mana syarikat sebelum ini.
Pusat Solar Bersepadu yang bakal dibina di Taman Teknologi Kulim itu mampu menghasilkan Panasonic Heterojunction Dengan Lapisan Nipis Pada Dasarnya (HIT) iaitu modul solar yang menawarkan kecekapan penukaran cahaya kepada sumber elektrik.
Ia secara tidak langsung memberi ciri cemerlang bagi pergantungan suhu yang dapat memastikannya lebih berkuasa walaupun ketika musim panas yang menyerap tenaga solar pada suhu tinggi.
Panasonic memilih Malaysia sebagai pangkalan baru berdasarkan sokongan kerjasama pelaburan negara ini serta prasarana yang baik dan kualiti tenaga kerja cemerlang.
Pusat Solar Bersepadu baru ini akan melaksanakan penghasilan wafer solar bersepadu, sel solar dan modul dengan anggaran kapasiti pengeluaran tahunan sebanyak 300 megawatt (MW).
Serentak itu, Panasonic akan melabur RM1.84 bilion dalam membangunkan kemudahan ini.
Dengan peningkatan kesedaran alam sekitar di peringkat global dan pengenalan sistem subsidi serta skim Feed-in-Tariff (FiT) di pelbagai negara, pasaran solar dijangka meningkat.
Permintaan yang kukuh dijangka berkembang dalam sektor kediaman yang menjadi sasaran utama bagi modul solar Panasonic HIT.
Presiden Panasonic, Masato Ito berkata, sebaik saja kemudahan penghasilan baru ini bermula, kapasiti pengeluaran syarikat itu akan menjadi 1.5 kali lebih besar berbanding sekarang.
"Dengan adanya kemudahan asas ini, kami berharap dapat meneruskan sumbangan kepada pembangunan Malaysia, seterusnya mengembangkan perniagaan kami di peringkat global," katanya.
Pusat Solar Bersepadu terbabit mendapat sokongan padu kerajaan negeri yang mengharapkan penggunaan solar dapat dimanfaatkan masyarakat Kedah.
Exco Kerajaan Negeri yang juga Pengerusi Kulim Technology Park Corporation, Datuk Amiruddin Hamzah memaklumkan, lokasi yang dipilih Panasonic bersesuaian bagi penggunaan solar yang membantu teknologi hijau pada masa depan.
"Dengan peningkatan kesedaran alam sekitar, jangkaan terhadap penjanaan tenaga solar akan meningkat di seluruh dunia.
Berdasarkan hubungan rapat dan mesra yang terjalin dengan Panasonic Corporation, negeri Kedah dan kerajaan Malaysia akan menyokong perniagaan solar dan pangkalan penghasilan baru ini," katanya.
Pangkalan baru ini bukan saja membantu Panasonic meningkatkan pengeluaran modul solar dan memenuhi permintaan pasaran, tetapi ia juga mengukuhkan kos daya saing dengan menyediakan pengeluaran wafer, sel dan modul bersepadu Panasonic yang pertama bagi syarikat itu.
Panasonic bukan hanya memasarkan modul solar saja tetapi turut disertakan dengan sistem penyimpanan bateri dan pelbagai peranti lain.
Tambahan lagi, Panasonic akan mempercepatkan pembangunan perniagaan solar secara global dengan kerjasama Penyelesaian Perniagaan Tenaga Komprehensif yang turut didatangkan bersama kumpulan syarikat Panasonic.
Pengarah Urusan Panasonic Asia Pasifik, Yorihisa Shiokawa berkata, Panasonic memberi fokus kepada perniagaan tenaga global yang kompetitif.
"Kami mendapati harga untuk produk berkaitan solar kini menurun di peringkat global dan ia sepatutnya dimanfaatkan masyarakat negara ini untuk mendapatkan tenaga alternatif yang berkos kompetitif," katanya.
Beliau memaklumkan, Panasonic bakal menawarkan penyelesaian bersepadu bagi tenaga solar termasuk produk rumah yang secara tidak langsung memberi manfaat bagi penggunaan tenaga mesra alam.
"Ketika dunia tercari-cari penggunaan tenaga baru, solar adalah penyelesaian terbaik manakala Malaysia juga mempunyai pancaran matahari yang cukup," kata Shiokawa.
Yoshikiwa turut memaklumkan, penyelesaian Panasonic lebih tertumpu kepada penggunaan bagi kawasan kediaman biasa berbanding rumusan China yang lebih mementingkan penggunaan industri berskala besar.
"Panasonic memahami keperluan rumah amat penting bagi pengguna biasa," katanya.
Majlis pecah tanah pangkalan solar Panasonic dirasmikan wakil Menteri Besar yang juga Pengerusi Jawatankuasa Agama dan Pelajaran, Datuk Mohamed Taulan Rasul.
Cahaya solar ke atmosfera bumi
Cahaya matahari yang memancar ke atmosfera bumi menghasilkan kira-kira 1,366 watt semeter persegi (W/m2).
Bagaimanapun, faktor seperti latitud, musim tahunan dan cuaca akan mengurangkan perolehan tenaga pada paras bumi.
Apabila bergerak merentasi atmosfera, enam peratus sinaran matahari akan dipantulkan manakala 16 peratus lagi diserap lalu menghasilkan sinaran puncak pada khatulistiwa yang berukuran 1,020 W/m² sebelum keadaan atmosfera purata (awan, debu atau pencemaran) mengurangkan jumlah cahaya pada kadar 20 peratus melalui pantulan dan tiga peratus melalui penyerapan.
Keadaan atmosfera bukan saja mengurangkan jumlah cahaya yang mencapai permukaan bumi tapi juga mempengaruhi kualiti melalui penyerakan cahaya dan pengubahan spektrumnya.
Contohnya, di Amerika Utara, proses cahaya yang dinamakan penyuriaan purata berukuran antara 125 dan 375 W/m² iaitu kuasa yang boleh diperoleh dan bukan kuasa yang dibekalkan.
Panel fotovolta pada masa kini mengubah kira-kira 15 peratus cahaya matahari secara terus kepada elektrik, maka panel matahari di Amerika Syarikat mengeluarkan secara purata 19 ke 56 W/m² atau 0.45-1.35 kWh/m²/hari.
Hanya sedikit kebimbangan timbul iaitu masalah kekaburan, satu kesan pencemaran yang menyebabkan hanya sedikit cahaya matahari dipancarkan ke permukaan bumi.
Ia berkait rapat dengan pencemaran zarah dan pemanasan global serta kebanyakan kerisauan pada isu perubahan iklim sejagat tapi mencetuskan kebimbangan penyokong tenaga matahari kerana potensi kekurangan tenaga matahari yang ada pada masa hadapan.
Penggunaan solar di Malaysia
Solar yang juga termasuk dalam kategori sumber tenaga diperbaharui, antara lain boleh diperoleh menerusi penggunaan cahaya matahari dengan memasang panel solar seperti kaca di bangunan industri, komersial, perumahan dan bangunan awam.
Panel itu berfungsi menghasilkan bekalan elektrik untuk menggerakkan peralatan dalam unit kediaman atau bangunan berkenaan.
Umum mengetahui bekalan tenaga elektrik di unit kediaman atau bangunan komersial ketika ini dibekalkan stesen atau loji tenaga kuasa yang kebanyakannya berasaskan minyak sebagai penjana utamanya.
Setakat ini, tenaga solar adalah pilihan terbaik dalam mendapatkan sumber tenaga alternatif di negara kita yang sememangnya terkenal sebagai negara yang mempunyai sumber cahaya matahari yang banyak.
Bagaimanapun, galakan penggunaannya boleh dimulakan dengan memberi penumpuan khusus kepada beberapa projek hartanah dan komersial yang lestari bagi memperkenalkan konsep perumahan atau bangunan yang menggunakan tenaga solar di Malaysia.
Usaha berkenaan perlu dilakukan secara kolektif, sama ada daripada kerajaan, pihak berkuasa tempatan (PBT) dan pihak swasta kerana kelebihan menggunakan tenaga solar ini memberi manfaat kepada semua pihak.
Antara usaha yang boleh dilakukan kerajaan termasuk memperkenalkan dasar yang jelas dan PBT memberi insentif dalam bentuk pengurangan dari segi cukai pintu kepada kediaman atau bangunan berasaskan 'kediaman hijau' atau 'bangunan hijau'.
Pelaksanaan mekanisme tarif pembayaran bagi janakuasa tenaga boleh diperbaharui atau FiT di bawah Akta Tenaga Boleh Diperbaharui (RE) yang diwartakan, dijangka turut membantu meningkatkan lagi penggunaan tenaga solar di dalam negara.
Pelaksanaan mekanisme FiT menerusi Akta Tenaga Boleh Diperbaharui itu diumumkan kerajaan pada Bajet 2011 lalu bagi membolehkan bekalan elektrik yang dihasilkan premis perumahan dan penyedia bebas dijual kepada syarikat utiliti bekalan elektrik seperti Tenaga Nasional Bhd (TNB).
Melalui undang-undang tenaga diperbaharui itu, individu yang menjana tenaga solar ini akan mendapat pulangan sehingga lima kali ganda tenaga elektrik yang dijual kepada TNB dan pembayaran ini dijamin kerajaan selama 21 tahun.
Ia turut mampu diperluaskan meliputi kawasan sesebuah pekan seperti yang diamalkan di Jepun yang menyaksikan penghuni di kawasan itu menggunakan kuasa solar sepenuhnya dalam mendapatkan bekalan elektrik dengan menggunakan sistem solar yang disambungkan ke grid tenaga luar.










SEDA MALAYSIA Grid-Connected Photovoltaic Systems Course for Wireman and Chargeman
SEDA Malaysia provides training on the Grid-Connected Photovoltaic (PV) System Course for Wireman and Chargeman. The 5-day course is structured to intensify human capital development in Malaysia RE industry especially in solar PV. Among the objective of the course is to expose the wireman and chargeman in Malaysia with regards to solar PV installation dealing with direct current (DC) side and components. The training will encompass both theoretical and practical sessions, ending with a competency examination.
The course covers:
  • The introduction of GCPV systems that include solar PV modules, inverter and associated equipment; and
  • The installation and maintenance of the GCPV systems that need to be emphasized by Wireman and Chargeman
The training will be held at Universiti Kuala Lumpur - British Malaysia Institute (UniKL BMI), Gombak, Selangor and Universiti Teknikal Malaysia Melaka (UTeM). The fee is inclusive of course materials, provision of facilities for practical sessions and insurance. However, the fee does not cover accommodation and transportation to the training centre during the training. The course information and application form can be downloaded from the following link. If you have any other enquiries on the training, please email to: pvtraining@seda.gov.my or call the Training Administrators:
  • Cik Sabrina Ab Rahim at (603) 6184 1000 (email: sabrina@bmi.unikl.edu.my) for UniKL BMI                      
  • Dr. Hidayat Bin Zainuddin at 06 233 0082 / 06 233 6263 / 06 233 6264 (email: pv.training@utem.edu.my) for UTeM                                                
Please click the link below for more info:
Registration fee: RM2,544.00
Repeat theory and practical exam:
        i)  Re-sitting for Theory only: RM106.00
        ii) Re-sitting for  Practical only: RM106.00
        iii)Re-sitting for Theory and Practical: RM212.00
*The fee is including 6% of GST
The exams must be taken at the training institution where the course was taken.
The tentative training dates for 2016 are as follows:
1. Universiti Kuala Lumpur - British Malaysia Institute (UniKL BMI)
No.Code     Date        Status

2. Universiti Teknikal Malaysia Melaka (UTeM)
No.Code     Date        Status
1WCM16-0118th - 22nd January 2016Open
Notes:
  • Limited to only 20 participants per training session.
  • The registration will only be confirmed upon receipt of the applicable fees.
  • ANY FEES PAID ARE NOT REFUNDABLE.  HOWEVER, CONFIRMED SEATS IS TRANFERRABLE.
  • Any postponement by a participant can only be made at least one (1) month before the training date. A participant is not allowed to postpone his/her training date if he/she is unable to find a replacement by the date falling 1 month before the registered training date.
Grid-connected Solar Photovoltaic for Wireman and Chargeman Course book is now for sale. Please clickhere for more info.



SEDA Malaysia Grid-Connected Photovoltaic (PV) Systems Design Course
SEDA Malaysia provides training on Grid-Connected Photovoltaic (PV) Systems Design Course. The 8-day course will encompass both theoretical and practical sessions, ending with a competency examination.
The course covers:
  • Design of grid-connected PV systems which include solar PV modules, inverter and associated equipment that is suitable for Malaysia climate conditions.
  • Information about grid-connected solar PV systems.
  • Relevant Malaysian requirements and standards for a grid-connected PV system.
(Note: the electrical connection between the inverter to the supply (AC side) can only be undertaken by licensed electricians issued by Suruhanjaya Tenaga).
The training will be held at Universiti Teknologi MARA (UiTM) and Selangor Human Resource Development Centre (SHRDC).The fee is inclusive of course materials, provision of facilities for practical sessions and lunch. However, the fee does not cover insurance, accommodation and transportation to the training centre during the training. - details can be found in the Application Form. The training schedule course content and application form can be downloaded from the following links.
•       Course Information
•       Course Schedule
Registration fee:
        i) Local participant: RM6,000.00
        ii) International participant: RM7,000.00
Repeat theory and practical exam:
        i)  Re-sitting for local participant on Theory only: RM212.00
        ii) Re-sitting for local participant on Practical only: RM212.00
        iii)Re-sitting for local participant on Theory and Practical: RM424.00
        iv)Re-sitting for International participant on Theory only: RM318.00
        v) Re-sitting for International participant on Practical only: RM318.00
        vi)Re-sitting for International participant on Theory and Practical: RM636.00
* The fee is including 6% of GST 
The exams must be taken at the training institution where the course was taken.
If you have any other enquiries on the training, please email pvtraining@seda.gov.my or call the Training Administrators:
        i) Mr. Langga anak Rimon (langgarimon@gmail.com) at (603) 5521 1995 for Universtiti Teknologi MARA (UiTM)
        ii) Mr. David Khoo (solarpv@shrdc.org.my) at (603) 5513 3560 for Selangor Human Resource Development Centre (SHRDC)
The tentative training dates for 2016 for institutions are as follows:
i. Universiti Teknologi MARA (UiTM)
NoCodeDateStatus
Re-sit session for theory and practical exam (no refreshments and no lunch provided):
NoCodeDateTimeStatus
The training fee for the course conducted by UiTM is Human Resource Development Fund (HRDF) claimable for SBL and SBL Khas schemes.
ii. Selangor Human Resource Development Centre (SHRDC)
NoCodeDateStatus
1DNS16-0111th - 19th January 2016Open
Re-sit session for theory and practical exam (no refreshments and no lunch provided):
NoCodeDateStatus
Notes:
  • Limited to only 16 participants per training session.
  • The training or exam/s shall be conducted with a minimum of 10 participants and a maximum of 16 participants.
  • The registration will only be confirmed upon receipt of the applicable fees.
  • All payments must be received and cleared at least two (2) weeks before the start of the registered training date.
  • A Company may register more than one participant. However, priority will be given to only two participants per company. Subsequent registered participants may be accepted depending on the availability of seats closer to the training date.
  • ANY FEES PAID ARE NOT REFUNDABLE.  HOWEVER, SEATS MAY BE TRANSFERRED.
  • Any postponement by a participant can only be requested in writing to the training administrator at least one (1) month before the training date. A participant is not allowed to postpone his/her training date if he/she is unable to find a replacement by one (1) month before the start of the registered training date.
  • For all courses beginning 1st April 2015, each participant is required to pay the GST rate of 6% of the total course fee in addition to the course fee itself. Please make the full Course fee and GST payments to the respective training provider.  
SEDA Malaysia Grid-Connected Photovoltaic Systems Design Course book is now for sale. Please click herefor more info.



SEDA Malaysia Off-Grid Photovoltaic (OGPV) Systems Design Course

SEDA Malaysia Off-Grid Photovoltaic (OGPV) Systems Design Course
This 10-day course will encompass both theoretical and practical sessions, ending with a competency examination.
The course covers:
  • Design of off-grid  PV systems which include solar PV modules, inverter and associated equipment that is suitable for Malaysia climate conditions.
  • Information about off-grid solar PV systems.
  • Relevant Malaysian requirements and standards for an off-grid PV system.
(Note: the electrical connection between the inverter to the supply (AC side) can only be undertaken by licensed electricians issued by Suruhanjaya Tenaga).
The training will be held at Universiti Teknologi MARA (UiTM), Shah Alam. The fee is inclusive of course materials, provision of facilities for practical sessions and lunch. However, the fee does not cover insurance, accommodation and transportation to the training centre during the training. - details can be found in the Application Form. The training schedule course content and application form can be downloaded from the following links:
•       Course Information
•       Course Schedule
•       Application Form
Registration fee:
        i) Local participant: RM7,420.00
        ii) International participant: RM7,950.00
Repeat theory and practical exam:
        i)  Re-sitting for local participant on Theory only: RM318.00
        ii) Re-sitting for local participant on Practical only: RM318.00
        iii)Re-sitting for local participant on Theory and Practical: RM636.00
        iv)Re-sitting for International participant on Theory only: RM424.00
        v) Re-sitting for International participant on Practical only: RM424.00
        vi)Re-sitting for International participant on Theory and Practical: RM848.00
* The fee is including 6% of GST 
If you have any other enquiries on the training, please email pvtraining@seda.gov.my or call the Training Administrator:
  • Mr. Langga anak Rimon (langgarimon@gmail.com) at (603) 5521 1995 for Universtiti Teknologi MARA (UiTM)
The tentative training dates for 2015 for institutions are as follows:
i. Universiti Teknologi MARA (UiTM)
NoCodeDateStatus
1DF15-0123rd November - 4th December 2015Closed
The training fee for the course conducted by UiTM is Human Resource Development Fund (HRDF) claimable for SBL and SBL Khas schemes.
Notes:
  • Limited to only 12 participants per training session.
  • The training or exam/s shall be conducted with a minimum of 10 participants and a maximum of 12 participants.
  • The registration will only be confirmed upon receipt of the applicable fees.
  • All payments must be received and cleared at least two (2) weeks before the start of the registered training date.
  • A Company may register more than one participant. However, priority will be given to only two participants per company. Subsequent registered participants may be accepted depending on the availability of seats closer to the training date.
  • ANY FEES PAID ARE NOT REFUNDABLE.  HOWEVER, SEATS MAY BE TRANSFERRED.
  • Any postponement by a participant can only be requested in writing to the training administrator at least one (1) month before the training date. A participant is not allowed to postpone his/her training date if he/she is unable to find a replacement by one (1) month before the start of the registered training date.
  • Each participant is required to pay the GST rate of 6% of the total course fee in addition to the course fee itself. Please make the full Course fee and GST payments to the respective training provider.  





Pemasangan dan Penyenggaraan Sistem Solar Fotovolta Tersambung Grid
Pihak Berkuasa Pembangunan Tenaga Lestari Malaysia (Sustainable Energy Development Authority Malaysia – SEDA Malaysia) adalah sebuah Badan Berkanun yang ditubuhkan di bawah Akta Pihak Berkuasa Pembangunan Tenaga Lestari 2011 [Akta 726]. Peranan utama SEDA Malaysia adalah untuk mentadbir dan menguruskan pelaksanaan mekanisme Tarif Galakan (Feed-in Tariff - FiT)  yang telah diberi mandat di bawah Akta Tenaga Boleh Baharu (TBB) 2011 [Akta 725]. Di bawah akta ini, terdapat lima (5) sumber boleh baharu yang telah dikenalpasti dan memenuhi kriteria untuk dilaksanakan dan mendapat faedah dari mekanisma FiT iaitu biojisim, biogas, hidrokuasa kecil, solar fotovolta (PV) dan geoterma.
Teras Tiga (3) Polisi dan Pelan Tindakan Tenaga Boleh Baharu Nasional, menjelaskan keperluan untuk mempergiatkan usaha pembangunan modal insan dalam industri Tenaga Boleh Baharu (TBB). SEDA Malaysia amat maklum terdapat keperluan yang kritikal untuk meningkatkan pengetahuan dan kompetensi pekerja tempatan dalam bidang solar PV bagi memastikan sistem yang akan dipasang adalah berkualiti, mematuhi piawaian yang ditetapkan dan dapat bertahan lama. Oleh yang demikian, SEDA Malaysia telah membangunkan kursus latihan Pemasangan dan Penyenggaraan Sistem Solar Fotovolta (PV) Tersambung Grid untuk meningkatkan kecekapan Penyedia Perkhidmatan solar PV tempatan.
Kursus ini akan diadakan di Selangor Human Resource Development Centre (SHRDC) dan Akademi Binaan Malaysia (Wilayah Utara. Yuran adalah termasuk kos bahan pembelajaran (buku) dan makan & minum sepanjang kursus dijalankan. Walaubagaimanapun Yuran tidak termasuk kos penginapan dan pengangkutan peserta ke pusat latihan.
Maklumat lanjut berkenaan kursus:
Sebarang pertanyaan berkenaan kursus ini, sila emailkan kepada: pvtraining@seda.gov.my atau hubungi:
i. Mr. David Khoo (solarpv@shrdc.org.my) di talian (603) 5513 3560 bagi Selangor Human Resource Development Centre (SHRDC)
ii. En. Zolkefli bin Abdullah (zolabmu@yahoo.com.my) di talian (604) 924 2200 bagi Akademi Binaan Malaysia (Wilayah Utara)

Jadual kursus bagi tahun 2015:
i. Selangor Human Resource Development Centre (SHRDC)
NoKodPengambilanTempohStatus
1IMS15-0131 Julai 2015
(Workforce Technical 
Transformation Programme)
6 bulan
(3 bulan teori dan
3 bulan praktikal-latihan industri)
Tutup

Buku Pemasangan dan Penyenggaraan Sistem Solar Fotovolta Tersambung Grid kini dijual. Sila klik di siniuntuk maklumat lanjut.





LIST OF APPLICATIONS FOR SOLAR PHOTOVOLTAIC
QUOTA FOR NON-INDIVIDUALS WITH CAPACITY ABOVE 425kW UP TO AND INCLUDING 1MW.


Submission No.                                               Applicant’s Name                                       Capacity Applied (kW)

S095                                   MUTIARA NGULANG ENERGY SDN BHD                                         1000
S096                                   MAXGREEN ENERGY 2 SDN BHD                                                      1000
S097                                   YIPS ENERGY SDN BHD                                                                        1000
S098                                   TEKNIK SEMESTA SDN BHD                                                                 700
S099                                   GV BUMISINAR SDN BHD                                                                      1000
S100                                   MYANGKASA SERVICES SDN BHD                                                    1000
S101                                   DEKAD ALIRAN SURIA SDN BHD                                                        800
S102                                   SOLARIS GEMILANG SDN BHD                                                            1000
S103                                   ENNESA POWER SDN BHD                                                                   1000
S104                                   GV ECO TECH SDN BHD                                                                         500
S105                                   CEMPAKA SOLARIS SDN BHD                                                            1000
S106                                   ARASH ENERGY SDN BHD                                                                  1000
S107                                   RENTAK TRANSFORMASI SDN BHD                                                  700
S108                                   MSI GILLS SDN BHD                                                                              1000
S109                                   SUNNYSIDE INNOVATIONS SDN BHD







LIST OF APPLICATIONS FOR SOLAR PHOTOVOLTAIC
QUOTA FOR NON-INDIVIDUALS WITH CAPACITY ABOVE 425kW UP TO AND INCLUDNG 1MW.

Submission No.                                                 Applicant’s Name                                  Capacity Applied (kW)

S001 BAKRI GREEN ENERGY SDN BHD 1000
S002 PEAKVEST SDN BHD 1000
S003 SUMBER ELEKTRON SDN BHD 1000
S004 AZIMAT PELANGI SDN BHD 1000
S005 SOLAR MANAGEMENT (REMBAU) SDN BHD 1000
S006 MATAHARI KENCANA SDN BHD 1000
S007 MATAHARI SURIA SDN BHD 1000
S008 PREFERRED PLOT SDN BHD 1000
S009 ZAIN SOLARTEK SDN BHD 1000
S010 GLOBETRONICS SDN BHD 450
S011 POWERNET VENTURE SDN BHD 1000
S012 CHANTIKA KELANG BERAS SDN BHD 1000
S013 INTEGRATED LOGISTICS SOLUTIONS SDN BHD 1000
S014 HERBALNET (MALAYSIA) SDN BHD 1000
S015 STARKEN AAC SDN BHD 1000
S016 NATIONGATE SOLUTION (M) SDN BHD 1000
S017 TVE TENAGA SDN BHD 1000
S018 GROOVELAND SDN BHD 1000
S019 BOUNTY VALUES SDN BHD 1000
S020 GUBAHAN JAYA SDN BHD 1000
S021 AMBANG FIESTA SDN BHD 1000
S022 GREEN CATALYST SDN BHD 1000
S023 ANN JOO MANAGEMENT SERVICES SDN BHD 1000
S024 SOLAR MAJESTIC SDN BHD 1000
S025 SUNTECH ENERGY SDN BHD 1000
S026 ISO TECHNOLOGY SDN BHD 450
S027 FAIRVIEW EQUITY PROJECT SDN BHD 1000
S028 OUTREACH GREEN SDN BHD 700
S029 PEMBINAAN EASTERN ALUMINIUM SDN BHD 1000
S030 TTL ENERGY SDN BHD 1000
S031 DAMI AIDI SOLAR SDN BHD 1000
S032 EVERGREEN ADVENTURE SDN BHD 1000
S033 ETERNITY EVERISE SDN BHD 1000
S034 TEROKA SURIAMAS SDN BHD 1000
S035 THYE HUAT CHAN SENDIRIAN BERHAD 1000
S036 TAN CHONG MOTOR ASSEMBLIES SDN BHD 1000
S037 MAHENDRAN SURYA INNOVATIONS SDN BHD 1000
S038 BERSATU FREIGHT AGENCY SDN BHD 1000
S039 IKRAM GREENTECH SDN BHD 1000
S040 HARN LEN REALTY (TAMPOI) SDN BHD 1000
S041 RICH PARADISE SDN BHD 1000
S042 AMAZING PARADIGM SDN BHD 1000
S043 HBH GLOBAL ENERGY SDN BHD 1000
S044 COVERIGHT SURFACES MALAYSIA SDN BHD 1000
S045 RUBY SQUARE SDN BHD 1000
S046 SETANDING ESTETIKA SDN BHD 1000
S047 JANA DCS SDN BHD 1000
S048 UNIVERSAL GREENVIEW SDN BHD 1000
S049 SS EVERICH SDN BHD 1000
S050 STERLING FIESTA SDN BHD 1000
S051 TANDA HEBAT SDN BHD 1000
S052 MARUDU POWER SDN BHD 1000
S053 VAFE SYSTEM SDN BHD 1000
S054 KAGAYAKI ENERGY SDN BHD 1000
S055 POWER GENES RESOURCES SDN BHD 1000
S056 TAMBUNAN SOLAR SDN BHD 1000
S057 SI STANDARD SDN BHD 1000
S058 KUMPULAN MELAKA BERHAD 1000
S059 SIBUGA ENERGY SDN BHD 1000
S060 RUSHOE ENTERPRISES SDN BHD 1000
S061 MIE CORPORATE HOLDINGS SDN BHD 1000
S062 TRI-L INDUSTRY SDN BHD 1000
S063 NERASAU SOLAR SDN BHD 1000
S064 SOLARCORP SDN BHD 1000
S065 GANDINGAN TUJUH (M) SDN BHD 1000
S066 IRE-TEX PACKAGING SDN BHD 1000
S067 ENERGY FACTORY SDN BHD 1000
S068 ENERGENETIC SDN BHD 1000
S069 KUALA PENYU SOLAR SDN BHD 700
S070 SCHB ENGINEERING SERVICES SDN BHD 1000
S071 AL MIQDAD SDN BHD 1000
S072 TIAM LOCK ENTERPISE SENDIRIAN BERHAD 1000
S073 G-FORCE SDN BHD 1000
S074 MECHANICAL TRAINING SOLUTION SDN BHD 1000
S075 KOMPASS MURNI SDN BHD 1000
S076 KUDAT SOLAR SYNERGY SDN BHD 1000
S077 ZMZ TERUS JAYA SDN BHD 1000
S078 ACUSOLAR SDN BHD 1000
S079 KUNCI QUANTUM SDN BHD 1000
S080 LEAF SOLAR SDN BHD 1000
S081 NAZA PROPERTIES SDN BHD 1000
S082 KINETICS FUSSION SDN BHD 850
S083 POWERLATOR SDN BHD 1000
S084 SUNWAY PFM SDN BHD 1000
S085 NK ENERGY SDN BHD 990
S086 NOBLE SENTRIX SDN BHD 1000
S087 LIEW KIM FAH & BROTHERS SDN BHD 1000
S088 FRONTIER INTEGRATOR (SABAH) SDN BHD 1000
S089 ECO MERIDIAN SDN BHD 700
S090 PACIFIC TRANSPORT SDN BHD 966
S091 ZINKLITE CORPORATION (M) SDN BHD 1000
S092 SMF ENGINEERING SDN BHD 1000
S093 TN CRANE SYSTEMS SDN BHD 1000
S094 PFS SOLAR SDN BHD 1000












Monday, 14 December 2015

Tenaga Boleh Baharu

Akta Tenaga Boleh Baharu 2011
article printer email
Akta Tenaga Boleh Baharu 2011

BIL.PERUNDANGAN SUBSIDIARIP.U(A)/P.U.(B)
1.Penetapan Tarikh Permulaan Kuat KuasaP.U.(B)
589/2011
2.Peraturan-Peraturan Tenaga Boleh Baharu (Kriteria bagi Sumber Boleh Baharu) 2011P.U.(A)
383/2011
3.Perintah Tenaga Boleh Baharu (Peruntukan Daripada Tarif Elektrik) 2011P.U.(A)
384/2011
4.Kaedah-Kaedah Tenaga Boleh Baharu (Kelulusan Galakan Dan Kadar Tarif Galakan) 2011    P.U.(A)
385/2011
5.Kaedah-Kaedah Tenaga Boleh Baharu (Perjanjian Pembelian Kuasa Tenaga Boleh Baharu) 2011    P.U.(A)
386/2011
6.Kaedah-Kaedah Tenaga Boleh Baharu (KehendakTeknikal Dan Pengendalian) 2011   P.U.(A)
387/2011
7.Kaedah-Kaedah Tenaga Boleh Baharu (Mendapatkan Wang Oleh Pemegang Lesen Pengagihan) 2011    P.U.A)
388/2011
8.Perintah Tenaga Boleh Baharu (Fi Pentadbiran) 2011    P.U.(A)
389/2011
9.Kaedah-Kaedah  Tenaga Boleh Baharu (Kelulusan Galakan Dan Kadar Tarif Galakan) (Pindaan) 2013    P.U.(A)
107/2013
10.Perintah Tenaga Boleh Baharu (Pindaan Jadual) 2013    P.U.(A)
108/2013
11.Kaedah-Kaedah Tenaga Boleh Baharu (Kelulusan Galakan Dan Kadar Tarif Galakan) (Pindaan) (No. 2) 2013    P.U.(A)
312/2013
12.Peraturan-Peraturan  Tenaga Boleh Baharu (Kriteria Bagi Sumber Boleh Baharu) (Pindaan) 2013    P.U.(A)
373/2013
13.Perintah Tenaga Boleh Baharu (Pindaan Jadual) (No. 2) 2013    P.U.(A)
374/2013
14.Perintah Tenaga Boleh Baharu (Peruntukan Daripada Tarif Elektrik) 2013    P.U.A)375/2013

Insentif Fiskal
article printer email

The Government of Malaysia offers attractive fiscal incentives to encourage the generation of Renewable Energy (RE) and the adoption of Energy Efficiency (EE) initiatives amongst energy producers and users in Malaysia and to ensure sustained national economic development for the future.

The Ministry of Energy, Green Technology and Water (MEGTW) is responsible for the implementation of national policies relating to RE and EE and desires to accelerate the adoption of RE and EE initiatives.

The incentives are aimed to support local industries and service providers to invest on RE and EE. The fiscal incentives granted are:
  • Pioneer Status (PS);
  • Investment Tax Allowance (ITA); and
  • Tax & Stamp duty exemption for GBI certified property
a. Tax Incentives for Energy Generation Activities Using Renewable Energy Resources
Companies undertaking generation of electricity using renewable energy resources such as biomass, biogas, solar photovoltaic, inorganic waste and, hydropower (not exceeding 30 megawatts) are eligible for the following incentives:
  1.  Pioneer Status with income tax exemption of 100% of the statutory income for ten years. Unabsorbed capital allowances as well as accumulated losses incurred during the pioneer period can be carried forward and deducted from the post pioneer income of the company, or
  2. Investment Tax Allowance of 100% on the qualifying capital expenditure (such as expenditure on factory, plant, machinery or other equipment used for the approved project) incurred within a period of five (5) years This allowance can be offset 100% of the statutory income for each year of assessment. Any unutilised allowance can be carried forward to subsequent years until fully utilised.
For the purpose of this incentive, ‘biomass sources’ refer to palm oil mill/estate waste, rice mill waste, sugar cane mill waste, timber/sawmill waste, paper recycling mill waste, municipal waste, and biogas (from landfill, palm oil mill effluent (POME), animal waste and others), while energy forms refer to electricity, steam, chilled water, and heat. Companies must implement their projects within one (1) year from the date of approval. With effect from 8 September 2007, other companies in the same group are eligible for the same incentives as above even though one company in the same group has been granted the incentive.

Applications received by 31 December 2015 are eligible for this incentive. Applications should be submitted to MIDA.

b. Tax Incentives for Companies Providing Energy Conservation Services
In order to reduce operation costs as well as to promote environmental preservation, companies providing energy conservation services are eligible for the following incentives:
  1.  Pioneer Status with income tax exemption of 100% of the statutory income for a period of ten years. Unabsorbed capital allowances as well as accumulated losses incurred during the pioneer period can be carried forward and deducted from the post pioneer income of the company, or
  2. Investment Tax Allowance (ITA) of 100% on the qualifying capital expenditure incurred within five (5) years. The allowance can be offset against 100% of the statutory income for each year of assessment. Any unutilised allowance can be carried forward to subsequent years until fully utilised. The companies must implement their projects within one (1) year from the date of approval.

c. Tax Incentives for Companies Investing to Conserve Own Energy Use
Companies intending to incur capital expenditure for conserving energy for own consumption are eligible for:-
  •  ITA of 100% of the qualifying capital expenditure incurred within a period of 5 years.

Applications received by 31 December 2015 are eligible for this incentive. Applications should be submitted to MIDA.

d. Tax Incentives for Building Obtaining Green Building Index Certificate
In order to widen the usage of green technology, the Government has launched the green building index (GBI) on 21 May 2009. GBI is a green rating index on environment friendly buildings. As a measure to encourage the construction of buildings using green technology:
  1. Owners of buildings awarded the GBI certificate, are eligible for tax exemption equivalent to 100% of the additional capital expenditure incurred to obtain the GBI certificate. The exemption is allowed to set-off against 100% of the statutory income for each year of assessment. The incentive is applicable for new buildings and upgrading of existing buildings. The incentive is given only for the first GBI certificate issued in respect of the building. This incentive is effective for buildings awarded with GBI certificates from 24 October 2009 until 31 December 2014.
  2. Buyers of buildings and residential properties awarded GBI certificate bought from real property developers are eligible for stamp duty exemption on instruments of transfer of ownership of such buildings. The amount of stamp duty exemption is on the additional cost incurred to obtain the GBI certificate. The incentive is given only once to the first owner of the building.
This incentive is effective for sales and purchase agreement executed from 24 October 2009 to 31 December 2014.


How To Apply For The Incentives?

The application should be submitted to:

Malaysian Industrial Development Authority (MIDA)
Block 4, Plaza Sentral
Jalan Stesen Sentral 5
Kuala Lumpur Sentral
50470 KUALA LUMPUR
MALAYSIA.

Institusi-Institusi Penyelidikan & Pembangunan 
article printer email
Terdapat beberapa institusi R&D di Malaysia yang terlibat dalam penyelidikan saintifik dan ekonomi.
PTM adalah sebuah organisasi bebas dan 'non-profit', telah ditubuhkan pada Mei 1998 sebagai memenuhi keperluan perlunya sebuah pusat penyelidikan dan kajian tenaga di Malaysia. Aktiviti-aktiviti utamanya termasuklah membuat perancangan dan penyelidikan tenaga, kecekapan tenaga serta membuat kajian berkaitan teknologi, pembangunan mahupun demonstrasi. Ia juga bertanggungjawab mengumpul segala data berkaitan. PTM juga berfungsi sebagai sebuah agensi tenaga sehenti bagi menghubungkan universiti-universiti, institusi-institusi penyelidikan, pelbagai industri juga organisasi-organisasi tenaga tempatan mahupun antarabangsa. Walaubagaimanapun Pusat Tenaga Malaysia (PTM) sekarang dikenali sebagai nama Green Tech Malaysia.
Fungsi-fungsi utamanya adalah : 
  1. Ejen bagi sektor awam dan swasta
  2. Penjaga/Gedung pangkalan data tenaga negara
  3. 'Think-tank' untuk tenaga menerusi perkhidmatan pakar runding
  4. Penggalak program kecekapan tenaga negara
  5. Mengkoordinasi serta bertindak sebagai pengurus utama dalam penyelidikan tenaga, pembangunan dan projek-projek demonstrasi.

Visi
Kemapanan Bekalan Tenaga dan Air untuk Semua. Ke Arah Malaysia Hijau

Misi
Menginovasi dan Mengurus Sumber Secara Strategik bagi Menjamin Perkhidmatan Tenaga dan Air yang Berterusan, Berkualiti Serta Mampu Bayar dan Memacu Penggunaan Teknologi Hijau untuk Mempromosi Ekonomi dan Gaya Hidup Hijau.


Objektif
Bagi merealisasikan visi dan misi, objektif Kementerian ialah:
  • Memastikan pelaksanaan dasar-dasar pembangunan industri tenaga, air dan teknologi hijau secara berkesan;
  • Memastikan penyediaan infrastruktur yang menyeluruh, bersepadu, menepati piawaian dan berkualiti;
  • Menyediakan persekitaran yang kondusif bagi pembangunan industri dan teknologi;
  • Memastikan penyelidikan dan pembangunan (R&D) yang berterusan ke arah peningkatan penggunaan teknologi;
  • Memastikan sistem penyampaian perkhidmatan yang cekap, berkesan serta mampu bayar;
  • Memastikan mekanisme kawal selia dilaksanakan selaras dengan peruntukan perundangan sedia ada; dan
  • Meningkatkan keupayaan organisasi secara berterusan bagi mencapai matlamat industri dan teknologi hijau.

Seksyen Pengurusan Dana Akaun Amanah Industri Bekalan Elektrik (AAIBE)
article printer email
Fungsi
  • Menguruskan Akaun Amanah Industri Bekalan Elektrik (AAIBE).
  • Menguruskan pembayaran tuntutan dan pembiayaan Program/Projek AAIBE.
  • Memantau Pelaksanaan Program/Projek AAIBE.


Bahagian Tenaga Lestari
article printer email
Fungsi
  • Merangka dan merancang dasar, program dan aktiviti berkaitan dengan pembangunan, pengurusan dan penggalakan kecekapan tenaga;
  • Memantau pengurusan dan pelaksanaan dasar berkaitan Tenaga Boleh Baharu.



Seksyen Regulatori dan Pembangunan Teknologi Hijau
article printer email
Fungsi
  1. Merangka dan menetapkan hala tuju pelaksanaan program/projek pembangunan Bandar Rendah Karbon ke arah pembangunan lestari. 
  2. Merancang dan menetapkan hala tuju Green Technology Financing Scheme (GTFS) bagi menyokong pembangunan teknologi hijau. 
  3. Merancang, menetap dan memberi khidmat nasihat mengenai pelaksanaan program promosi ke arah memupuk dan meningkatkan kesedaran awam mengenai teknologi hijau di semua lapisan masyarakat. 
  4. Merangka, menetap dan menilai pelaksanaan International GreenTech & Eco Products Exhibition and Conference (IGEM) 
  5. Mewujudkan kerjasama pintar dalam pembangunan modal insan berkaitan teknologi hijau bagi tujuan pelaksanaan dan penyebarluasan aplikasi dalam sektor-sektor utama penjana ekonomi negara. 
  6. Menyelaras pelaksanaan program/projek Pelabelan Hijau (Green Labelling) bagi menyokong pembangunan produk dan perkhidmatan hijau negara. 
  7. Merancang pelaksanaan program/projek Direktori Hijau (Green Directory) sebagai pangkalan data utama (central repository) di peringkat nasional  untuk dijadikan sumber rujukan bagi produk dan perkhidmatan hijau negara. 
  8. Menetapkan hala tuju perluasan aplikasi serta pengembangan produk/perkhidmatan hijau tempatan menerusi inisiatif perolehan hijau (Green Procurement) menerusi pelaksanaan Perolehan Hijau Kerajaan (Green Government Procurement – GGP) dalam membantu memacu pertumbuhan ekonomi hijau negara. 
  9. Merangka pelaksanaan aktiviti/program perluasan aplikasi serta pengembangan produk/perkhidmatan hijau tempatan menerusi program pembangunan IKS dan Industri hijau tempatan dalam membantu memacu pertumbuhan ekonomi hijau negara. 
  10. Merancang dan menetapkan hala tuju pelaksanaan program/aktiviti promosi dan pembangunan Green ICT negara khususnya di sektor awam bagi menyumbang kepada pengurangan kadar pelepasan karbon dalam sektor ICT di peringkat nasional.



Seksyen Dasar Teknologi Hijau
article printer email
Fungsi
  1. Merancang, menggubal, melaksana, menyelaras dan memantau dasar teknologi hijau termasuk: 
    • Mengkaji dan menggubal dasar teknologi hijau untuk menjamin pembangunan mapan bagi meningkatkan kualiti hidup untuk memulihara alam sekitar melalui amalan yang mesra alam; 
    • Menggubal dasar untuk meningkatkan pembangunan ekonomi Teknologi Hijau; 
    • Menggubal dasar untuk menyokong pembangunan inovasi teknologi hijau bagi aplikasi dan pengurusan risiko yang mungkin dihadapi; dan 
    • Menggubal dasar untuk membangun dan menggalakkan budaya penggunaan sumber yang optimum.
  2. Merangka strategi pembangunan Teknologi Hijau melalui Pelan Induk Teknologi Hijau untuk:
    • Menentukan hala tuju pelaksanaan dan galakan teknologi hijau; 
    • Mewujudkan peluang pembangunan perniagaan hijau yang baru ; 
    • Mengorientasikan semula industri mempraktikkan amalan hijau; 
    • Membantu merangka strategik untuk membangunkan penyelidikan dan pembangunan (P&P) dalam teknologi hijau ke arah pengkomersilan untuk pembangunan pasaran tempatan; 
    • Mewujudkan dana dan insentif teknologi hijau bagi memacu pembangunan sektor yang lebih mantap dan pesat; 
    • Menjalin kerjasama strategik tempatan dan antarabangsa dan menjadi focal point dengan pelbagai pihak yang berkepentingan; dan 
    • Merancang, memantau dan menetapkan hala tuju pelaksanaan program/aktiviti promosi dalam pembangunan kenderaan elektrik negara.
  3. Urus setia Majlis Teknologi Hijau dan Perubahan Iklim untuk menentukan hala tuju dan memantau kemajuan pembangunan Teknologi Hijau. 
  4. Menguruskan isu-isu dan maklumbalas berkaitan Dasar Teknologi Hijau Negara di peringkat nasional dan antarabangsa. 
  5. Merancang, melaksana dan menilai pelaksanaan sesi Ministerial Dialogue, Asian Pavilion dan State Pavilion dalam International GreenTech & Eco Products Exhibition and Conference (IGEM). 
  6. Merancang, menetapkan dan memantau proses dan prosedur permohonan kod bidang pendaftaran teknologi hijau dalam sistem perolehan Kerajaan berdasarkan kelulusan yang diberikan oleh Kementerian Kewangan Malaysia. 
  7. Mengkaji, merancang dan merangka polisi 3R (reduce, reuse dan recycle) bagi menjayakan konsep waste to wealth dalam negara. 
  8. Memantau jumlah pelaburan dan pendapatan syarikat dalam industri teknologi hijau serta jumlah pekerjaan hijau yang diwujudkan dalam negara bagi tujuan pelaksanaan Program Transformasi Ekonomi.